Great Plains Zoo
The remodel of the Great Plains Zoo was divided into two separate phases. The construction included a new snow monkey exhibit, a remodeled entry and updated museum area. Safety tunnels were fabricated to protect the public and staff from the construction work so the zoo could remain open during the remodel.
![Great Plains Zoo](https://henrycarlson.com/wp-content/themes/hcc_2016/images/item_spacer.png)