First PREMIER Bank Ops Center
Former Esurance building is being renovated for First PREMIER Bank’s backroom operations. It will move hundreds of employees from a former warehouse in northeast Sioux Falls.
Southeast Technical College Simulation Center
Southeast Technical College will move in and renovate the current Zeal building to create a state-of-the-art Healthcare Simulation Center where students can learn everything from blood draws to surgery to emergency room training via simulation. The building will have six simulation rooms, and each room will be able to switch out equipment to fit various […]
LG Everist Rip Rap Plant
Relocation of the rip rap plant at the quartzite quarry.
Sioux Falls Regional Airport Parking Ramp
A new four-level parking structure is coming to the Sioux Falls Regional Airport. The structure will hold approximately 975 spaces. The new structure will stand where the current short-term and north long-term parking lots exist and include a skyway from the second level to the main terminal.
Sanford Ortho Expansion + Medical Suites
The new 205,000-square-foot hospital will include 161,000 square feet of new space adjacent to the Sanford Surgical Tower and 44,000 square feet of remodeled space currently used by the surgical tower. It will include 19 inpatient rooms, 12 operating rooms and 56 medical suite rooms that can be used by patients’ family members as hotel […]
Lincoln County Justice Center
A new ground up Justice Center Facility. The County has grown to be the third largest county in South Dakota with current population up 30% over the past 10 years. The current courthouse and administrative offices are in Canton, SD and were originally built in 1890. In 2008 the administration building was added along with […]
Minnehaha County Juvenile Justice Center
Minnehaha County South Dakota will potentially renovate the existing Juvenile Detention Center (“JDC”) or potentially replacement of the JDC with a new ground-up facility.
GRACO Expansion and Renovation
GRACO’s facility manufactures spray guns, parts and accessories. Expansion and renovation of approximately 92,700 SF of current telemarketing/banking suite and turning it into a manufacturing facility.
Sanford MB1
Sanford Health will add a five-story building focused on gastroenterology to the campus of Sanford USD Medical Center. The new Medical Building I, or MB1, will replace a building with the same name that was torn down a few years ago to create a 200-space parking lot. The new MB1, at 237,000 square feet to […]
LG Everist Nine Mile Park
Ace Ready Mix Project that includes: 7,434 (+/-) square foot plant area with bathrooms and breakroom 4,050 (+/-) square foot mezzanine office/dispatch/storage areas Pre-engineered metal building with insulated metal skin construction