Royal River Casino Renovation Phase 2
Phase 2 of the project brought the expansion of the gaming floor, repurposing what was previously the administrative offices. Also included in Phase 2 was the reconstruction of the Casino Porte-Cochere, expansion of the Casino Grand Entry, and Relocation of the Table Games Area.